WBCM Construction Services
Menu
WBCM Construction
Menu
Home
About
Services
Construction Management
General Contracting
Design Build
Owner’s Representation
Portfolio
Careers
Contact Us
667.403.2340
WBCM
ABOUT
SERVICES
PORTFOLIO
CAREERS
CONTACT
Nustar – Fuel Unloading Pier Relocation
Nustar -
Fuel Unloading Pier Relocation
Relocation of an existing fuel unloading pier including new marine concrete dolphins and supports, new catwalk and modifications to the fuel piping and electrical systems.
Client
Service(s) Provided
Location:
1 / 5
RELATED
PROJECTS
BWC Olive Oil Storage Tanks
Nustar – Fuel Unloading Pier Relocation
CONTACT US
Name
Email
Message
Name
This field is for validation purposes and should be left unchanged.
OUR SERVICES
Program Management
Project Management and Consulting
Pre-Construction Services
Feasibility Studies
Site Evaluations
Constructability Reviews
Cost Evaluations
Construction Cost Analysis
Conceptual Cost Development
Conceptual Schedule Development
Life Cycle Cost Analysis
Value Engineering
Utility Surveys
Construction Management
At-Risk Construction Management
Design-Build / Turnkey Project Delivery
General Contracting
EPC (Engineer-Procure-Construct)
CM Agency / Owner Representation
Project Scheduling
Bid Phase Management, Procurement & Evaluation
Estimating
Commissioning Assistance
Project Closeout & Turnover Documentation
Quality Assurance / Quality Control Program Creation & Management
Site Specific Health & Safety Plan Development
Claims Avoidance & Analysis
Expert Witness & Consulting