WBCM Construction Services

Liquid Terminal Expansion

Construction of a new terminal site and expansion of an existing liquid fertilizer terminal. Consisted of the installation of 1400 linear feet of double-walled underground HDPE piping, 25,000 cubic yards of fill for site leveling, and the construction of new truck loading stations, an administration building, access roads, process piping, and controls.
CONTACT US
This field is for validation purposes and should be left unchanged.
OUR SERVICES